Client Resources

Helpful links for permittees and site teams.

Quick access to the permit, SMARTS, weather forecasts and certification information we use every day.

Quick reference

Common stormwater terms

BMP
Best Management Practice. A control used to prevent or reduce pollution, such as fiber rolls, inlet protection or stabilized entrances.
CGP
California Construction General Permit, the statewide NPDES permit for construction stormwater.
COI
Change of Information. A SMARTS filing used to update permit details such as acreage or contacts.
NOI
Notice of Intent. The filing that obtains permit coverage before construction begins.
NOT
Notice of Termination. The filing that ends permit coverage once the site is stabilized.
QPE
Qualifying Precipitation Event. A storm that triggers inspection and sampling requirements under the permit.
QSD
Qualified SWPPP Developer. The certified professional who prepares and amends the SWPPP.
QSP
Qualified SWPPP Practitioner. The certified professional who performs inspections and sampling.
SMARTS
The State Water Board's online system for permit filings and reports.
SWPPP
Stormwater Pollution Prevention Plan. The site-specific plan required for permit coverage.
WDID
Waste Discharge Identification number assigned to a site when coverage is granted.
WPCP
Water Pollution Control Program, typically for projects disturbing less than one acre.

Questions about your permit?

Our team is happy to help. Reach out any time.

Request a ProposalCall (530) 363-2148